a solution to lifetime assessment of large generators
GAP3 (includes GAP1 and GAP2)is performed with the generator partially dismantled with terminals disconnected and during a 3 – 5 days turbine minor outage. The work performed is electrical tests on stator, rotor, exciter, accessories and visual examination to the extent accessible and visual examination.
The benefit you get
- Benefits of GAP1 and GAP2
- Visual inspection as accessible by removal of outer and inner end-shields and inspection covers
- Report in pdf format by e-mail
Just send an e-mail to atsjubail@alfanar.com for more information on GAP3