a solution to lifetime assessment of large generators
GAP1 is performed with the generator in operation and takes 1 – 2 days. The work performed is hot walkdown survey, data (operation, maintenance, historical) collection and interaction with Plant Engineers.
The benefit you get
- Establishes a baseline for higher levels of GAP
- Life estimation based on thermal stresses
- Report in pdf format by e-mail
Just send an e-mail to atsjubail@alfanar.com for more information on GAP1
No Comments